Sims Superior Seating was a $2.3 million project with coordination and consultation on design and constructability phases. The building is a 60,000 sf concrete tilt up building with 5,500 sf dedicated to corporate office with a class “A” finish. The remainder of the facility contains material storage, inventory storage, production areas, shipping facilities, paint/mixing booths, and warehouse offices. The project was fast tracked, and the owner was able to take possession of the building only four months after releasing the design. Project Duration- Beginning of design phase to owner occupation was only 4 months